INSTRUCTIONS FOR USE
• This device has been created to be integrated into the structure of specially made
sliding gates. The geared motor is fitted with screw type attachments that allow
it to be fitted inside metal profiles.
ASSEMBLY PROCEDURE
The unit may be positioned either to the right or to the left of the passageway.
Respect the following limits:
- SLi724: max. weight 700 kg
- SLi1024: max. weight 1000 kg
- SLi24DRACO: max. weight 1000 kg
The builder must make sure that the closing system respects the technical
indications supplied by the standards and laws in force:
- Opening and closing direction mechanical stops;
- Safety devices;
- Correct risk analysis at possible crushing points etc.
See: www.cardin.it - archives - Installation guide and approvals certificates -

MANUAL MANOEUVRE

120°
180°
1 - MOTOR RELEASED
- all commands are inhibited
- the gate can be moved by hand
An access slot will have to be built into the column for the release mechanism.
REMOVABLE DRIVE SHAFT SLi724 - SLi1024
Description :
638
SBLOCCO MOTORE
Description :
843
ate :
14-04-2015
SBLOCCO MOTORE
CCO SLI
S.p.A - 31020 San Vendemiano (TV) Italy - via Raffaello, 36 Tel: 0438/401818 Fax: 0438/401831
ate :
23-05-2018
S.p.A - 31020 San Vendemiano (TV) Italy - via Raffaello, 36 Tel: 0438/401818 Fax: 0438/401831
SLi724 - SLi1024
1
SLi24DRACO
1
2 - RELEASE MEC. REACTIVATED
- all commands are enabled
- the automation will start up again
in the repositioning mode

ELECTRICAL CONNECTION

Important remarks
• After having installed the device, and before powering up the
programmer, release the door (manual release mechanism)
and move it manually, checking that it moves smoothly and
has no unusual points of resistance.
• The presence of the electrical current sensor does not dispense
with the obligation to install photoelectric cells and other
safety devices foreseen by the safety standards in force.•
Before connecting the appliance make sure that the voltage
and frequency rated on the data plate conform to those of the
mains supply.
• The motor's power cable must be made of polychloroprene in
conformity with the international standard 60245 IEC 57 (e.g.
3 x 1.5 mm
• The cable may only be replaced by qualified technicians.
• An all pole trip switch with at least 3 mm between the contacts
must be installed between the unit and the mains supply.
• Don't use cables with aluminium conductors; don't solder the
ends of cables which are to be inserted into the binding posts;
use cables marked T min 85°C and resistant to atmospheric
agents.
• The terminal wires must be positioned in such a way that both
the wire and the insulating sheath are tightly fastened.
Motor - encoder and terminal board connections
• You must scrupulously respect the motor connection sequence between
the motors and the programmer. The order of the binding post connections
1 to 7 is identical on both;
- connect the wires of motor, the encoder and the
2
release mechanism (binding post 7 'Or' orange
for SLi24DRACO and 'Wh' white for SLi724 /
SLi1024) to the main board of the electronic
programmer using the terminal block;
- connect the pre-wired terminal to the motor
terminal block.
Electronic programming unit
Instructions for programming the ECU and battery powered operation
can be found in the MULTI-ECU SOFTWARE manual ZVL608 supplied
with the automation.
MAINTENANCE
180°
To use the 24 month or 50000 manoeuvre guarantee, read the following
notes carefully.
2
Attention! Before carrying out any cleaning or maintenance operations
make sure the power is disconnected at the mains, the motor power
cables are disconnected and the batteries have been disconnected.
Eventual repair work must be carried out by specialised personnel
using original spare parts.
The motor does not normally require particular maintenance; in any
case the 24 month or 50000 manoeuvre guarantee is only valid if the
following controls have been observed and eventual maintenance has
been carried out to the machine 'sliding gate':
- check the straightness of the toothed rack, make sure the teeth fit
correctly in the pinion throughout its entire length; in particular the gear
rack must have a cross section of 20 x 20 mm;
- check the play of the gear rack - pinion (1-2 mm);
- periodically check the moving parts for wear and tear and grease if
required, using lubricants which maintain their friction levels unaltered
throughout time and are suitable for temperatures of -20 to +70°C;
- check the battery charge level.
These checks must be written down as they are paramount in validating
the guarantee.
7
H05RN-F).
2
M
Rd Bk
1
PC
ENCODER
LCK
Bl Gr Gy Yw Or/Wh
2
3
4
5
6
7

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sli724Sli1024Sli24draco

Tabla de contenido