Cartridge Installation
1
A.
2
1
Turn off water supplies. Remove cover (1),
bonnet nut (2), test cap (3) and plasterguard (4).
If screen (5) is in place, remove before installing
cartridge.
Plasterguard may be discarded.
C.
1
Slide bonnet nut (1) over the cartridge and
thread onto the body. Hand tighten securely.
4
5
3
60 Series Installation
B.
1
Rotate the cartridge (1) so the word "UP" (2)
appears on the top. Insert cartridge into valve
body as shown. Make sure the cartridge tubes
and O-rings (3) are properly seated in holes at
the base of the body. Ensure the keys on the
body are fully engaged with the slots in the
body (4).
Back to back Installation
Normal Installation
(changes not required)
Reverse
Installation
3
For back to back or reverse installations
(hot on right and cold on left): Rotate cartridge
(1) so the word "UP" (2) appears on the bottom.
Install the cartridge making sure that the keys are
fully engaged with the slots in the brass body (see
step B). Slide bonnet nut (3) over the cartridge
and thread onto the body. Hand tighten securely.
3
2
3
4
2
Cold
1
Hot
91834
4
Rev. D