6 - TESTING AND COMMISSIONING THE AUTOMATION SYSTEM
The system must be tested by a qualified technician, who must
perform the tests required by the relevant standards in relation to
the risks present, to check that the installation complies with the
6.1 - Testing
All system components must be tested following the procedures de-
scribed in their respective operator's manuals;
ensure that the recommendations in Chapter 1 - Safety Warnings -
have been complied with;
check that the gate or door is able to move freely once the automa-
tion system has been released and is well balanced, meaning that it
will remain stationery when released in any position;
6.2 - Commissioning
Once all (and not just some) of the system devices have passed the
testing procedure, the system can be commissioned;
the system's technical dossier must be produced and kept for 10
years. It must contain the electrical wiring diagram, a drawing or
photograph of the system, the analysis of the risks and the solutions
adopted to deal with them, the manufacturer's declaration of con-
formity for all connected devices, the operator's manual for every
device and the system maintenance plan;
fix a dataplate with the details of the automation, the name of the
person who commissioned it, the serial number and year of con-
struction and the CE marking on the gate or door;
also fit a sign specifying the procedure for releasing the system by
hand;
If active, it provides maximum acceleration upon starting
0 = disabled
1 = active
Leaf delay relating to M1 in closing from open gate.
Sets the encoder type
0 = virtual encoder
1 = physical encoder
NOTE: the value depends on the type of motor selected.
Determine the type of automation on which the control unit is
installed:
1 = RAY2224,
2 = REP2224,
3 = UND24,UND24E*
4 = STAR3024 - STAR2024,
5 = RAY4224E*
0
1
0
1
to 1.
relevant regulatory requirements, especially the EN 12453 standard
which specifies the test methods for gate and door automation sy-
stems.
check that all connected devices (photocells, safety edges, emer-
gency buttons, etc.) are operating correctly by performing gate or
door opening, closing and stop tests using the connected control
devices (transmitters, buttons or switches);
perform the impact measurements as required by the EN12453
standard, adjusting the control unit's speed, motor force and de-
celeration functions if the measurements do not give the required
results, until the correct setting is obtained.
draw up the declaration of conformity, the instructions and precau-
tions for use for the end user and the system maintenance plan and
consign them to the end user;
ensure that the user has fully understood how to operate the system
in automatic, manual and emergency modes;
the end user must also be informed in writing about any risks and
hazards still present;
!
WARNING
after detecting an obstacle, the gate or door
stops during its opening travel and automatic closure is disabled;
to restart operation, the user must press the control button or use