Descargar Imprimir esta página

KAESER Eco-Drain Serie Manual De Instrucciones página 10

Publicidad

Electrical installation • Instalación eléctrica
Installation electrique • Elektrische Installation
0
Vac - voltages
0.8
normally open
0.7
common
0.6
normally closed
0.
PE
Earth/Ground
0.
N
Neutral
0.0
L
Phase
24 Vdc - voltage
normally open
0.8
common
0.7
normally closed
0.6
+4 Vdc (0V)
±4V
0V (+4 Vdc)
±4V
english
• Lift off domed cover (A) after removing
the 4 screws (B).
• Take power supply board (c) out of the
domed cover (A) after removing
screw (D).
• Guide cables for power supply (E)
and potential-free contact (F) through
screwed cable fittings.
• Terminals
check type plate (G) for permissible
mains voltage and ensure confor-
mity!
Vac power supply 0.0 L
0. N
0. PE
4 Vdc power supply +4 Vdc (0V)
0V (+4 Vdc)
In the case of 24 Vdc operation, do not
connect +24 Vdc to frame because
the internal housing potential of the
device is negative.
• Connect potential-free contact (F) to
terminals 0.6 - 0.7 (fail safe) or 0.7 - 0.8
(open during malfunction).
• Pull cable (E + F) tight and screw down
cable fittings.
• Screw power supply board (G) with
screw (D) into domed cover (A)
• Plug ribbon cable (H) into control
PCB (K)
• If the individual wires have not been
screwed into the plug, they should be
attached as follows:
1.0 = brown
. = blue
.0 = black
• Put on top of cover (A) and tighten the
4 screws (B)
please note:
The power supply board (c) is in a
reverse position (upside down) in the
domed cover (A).
During no-load operation, a voltage of up
to 36 Vdc may be measured at terminals
.0 and .(plug ribbon cable (H)).
Please ensure that the installation is
carried out according to the valid regula-
tions.
ECO-DRAIN 13, 13 CO, 13 CO PN25
t h e

Publicidad

loading

Este manual también es adecuado para:

Eco-drain 13Eco-drain 13 coEco-drain 13 co pn25