Descargar Imprimir esta página

Beko BEVPG 090 Manual De Instrucciones página 37

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

8
Indoor unit installation
Warning:
Before performing any
A
electrical or wiring work,
turn off the main power to
the system.
Step 6: Connect signal and power cables
The signal cable enables communication between
the indoor and outdoor units. You must first
choose the right cable size before preparing it for
connection.
Cable types
• Indoor power cable (if applicable): HO5W-F or
H05V2V2-F
• Outdoor power cable: H07RN-F or H05RN-F
• Signal cable: HO7RN-F
Note: In North America, choose
C
the cable type according to
the local electrical codes and
regulations.
Minimum cross-sectional area of power and
signal cables (for reference) (not applicable for
North America)
Rated current of
appliance (A)
> 3 and ≤ 6
> 6 and ≤ 10
> 10 and ≤ 16
> 16 and ≤ 25
> 25 and ≤ 32
> 32 and ≤ 40
Split type air conditioner / User Manual
Split type air conditioner / User Manual
Nominal cross-sectional
area (mm²)
0.75
1
1.5
2.5
4
6
Choose the right cable size
The size of the power supply cable, signal cable,
fuse, and switch needed is determined by the
maximum current of the unit. The maximum
current is indicated on the nameplate located on
the side panel of the unit.
Note: In North America, please
C
choose the right cable size
according to the minimum
circuit ampacity indicated on the
nameplate of the unit.
Warning:
All wiring must be
A
performed strictly in
accordance with the wiring
diagram located on the
back of the indoor unit's
front panel.
1. Open front panel of the indoor unit.
2. Using a screwdriver, open the wire box cover
on the right side of the unit. This will reveal the
terminal block.
Front view
Terminal block
Wire cover
Screw
Cable clamp
37
37 / 324 EN
/ 334

Publicidad

loading