Completing the set up
Now that you have your new refrigerator installed in place, you are ready to set up and
enjoy the features and functions of the appliance.
By completing the following steps, your refrigerator should be fully operational.
1. Make sure your refrigerator is in an appropriate location with reasonable clearance
between it and the wall. Refer to installation instructions in this manual.
2. Once the refrigerator is plugged in, make sure the interior light comes on when you
open the doors.
3. Set the Temperature control to the coldest temperature and wait for an hour.
The freezer will get slightly chilled and the motor will run smoothly.
Reset the refrigerator and freezer to the temperatures you want.
4. After you plug the refrigerator in, it will take a few hours to reach the appropriate
temperature.
You can store food and drinks in the refrigerator after the temperature is sufficiently
cool.
NOTE
• If condensation or water drops appear on both sides of the fridge door's central part,
turn the Energy Saver mode off after removing the condensation.
(See the explanation of the Energy Saver button in "Using the control panel" on page 40.)
Preventing Power Cord Damage
DA68-02981N-07.indb 37
To prevent power cord damage, fix any
excess power cord to the top rear of the
refrigerator as shown in the illustration
below.
English 37
2018. 7. 4.
1:17