Descargar Imprimir esta página

WIKA Gayesco TC59-E Manual De Instrucciones página 16

Conjunto termopar tubeskin

Publicidad

Idiomas disponibles

Idiomas disponibles

5. Commissioning and operation
Assemble instrument neck tube as per the installation requirement.
If applicable, attach connection head.
Route sensor or connection wires to termination location and complete electrical
connection.
EN
5.10.2
Piston/Spring exit
Pack the exit orifice of the furnace wall with high-temperature ceramic fiber (e.g.
Kaowool™) insulation to keep outside connections cool. Install plate and spring, tighten
collar at desired location. Install split washers and pipe cap.
CAUTION!
High temperature at the transition
Exceeding 175 °C [350 °F] at the transition could damage the sensor
Spring-loaded style
Piston style
16
Ensure transition does not exceed 175 °C [350 °F] and is a minimum
150 mm [6 in] from the furnace entry connection.
WIKA operating instructions model TC59-E (eTEFRACTO-PAD)
Existing
Existing

Publicidad

loading