GB
Installation and start up
Connect the appliance to the solar pan-
els according to table 1, which states the
lengths and sizes of the wires used for con-
necting the appliances.
Standard supplied cable size and length will
²
be 6mm
and 20m.
The screened cables coming from the PV
panels are fitted with a male/female MC4
compatible connectors. The connections
are then to be mounted to the prefixed
male/female MC4 compatible connectors
placed at the back of the appliance - See
fig. 8
The connections are of plug and play type
and can only be fitted correct - male to
female/female to male.
Clean the appliance thoroughly before start
up.
Size:
Cross section
AWG
[mm2]
[Gauge]
2,5
12
4
12
6
10
10
Table 1
fig. 8
Max. length:
[m]
8
13
20
8
32
105
Start up
Before the appliance is loaded with vaccine,
the ice pack ballast must be frozen. The
cool-down time in an ambient temperature
of 43°C will be approx. 6 days.
When the temperature on the display of
the thermometer is approx. +4°C in the
morning, the appliance is ready for load-
ing vaccine. Check the temperature in the
basket. The temperature must be between
+2°C and +8°C.
The vaccines must be placed and arranged
as shown on page 11.
The temperature in the vaccine compart-
ment must always be monitored on the ther-
mometer and be between +2°C and +8°C.
The controller is factory set and should not
be adjusted by unauthorized personnel.
[ft]
26
42
65
10
fig. 9