Check before Power-on
No.
1
The product is firmly installed at a clean place that is well-ventilated and easy-to-operate.
The PE, DC input, Battery, AC output, and communication cables are connected correctly
2
and securely.
3
Cable ties are intact, routed properly and evenly.
The voltage and frequency at the connection point meet the inverter grid connection
4
requirements.
5
The compartment door is installed.
6
Switches of the upstream and downstream should be all off.
EU Declaration of Conformity
GoodWe Technologies Co., Ltd. hereby declares that the inverter with wireless communication
modules sold in the European market meets the requirements of the following directives:
• Radio Equipment Directive 2014/53/EU (RED)
• Restrictions of Hazardous Substances Directive 2011/65/EU and (EU) 2015/863 (RoHS)
• Waste Electrical and Electronic Equipment 2012/19/EU
• Registration, Evaluation, Authorization and Restriction of Chemicals (EC) No 1907/2006 (REACH)
GoodWe Technologies Co., Ltd. hereby declares that the inverter without wireless communication
modules sold in the European market meets the requirements of the following directives:
• Electromagnetic compatibility Directive 2014/30/EU (EMC)
• Electrical Apparatus Low Voltage Directive 2014/35/EU (LVD)
• Restrictions of Hazardous Substances Directive 2011/65/EU and (EU) 2015/863 (RoHS)
• Waste Electrical and Electronic Equipment 2012/19/EU
• Registration, Evaluation, Authorization and Restriction of Chemicals (EC) No 1907/2006 (REACH)
You can download the EU Declaration of Conformity on
LED Indicators
Indicator
Power
Operating
Faulty
Check Item
www.goodwe.com.
ON=INVERTER POWER-ON
OFF=INVERTER POWER-OFF
ON=SYSTEM IS READY
BLINK=SYSTEM IS STARTING UP
OFF=SYSTEM IS NOT OPERATING
ON=FAULT HAS OCCUREED
BLINK=OVERLOAD OF BACK-UP OUTPUT/REDUCE LOAD
OFF=NO FAULT
03
Explanation
EN