3. Slide axle (D) into holder on assembly legs.
(See Figure 3)
Figure 3
4. Load packaging material on the stand, unspooling
from the outside.
PAGE 2 OF 6
ASSEMBLY CONTINUED
5. Adjust I-bolt on top of the feed clamp to packaging
material thickness. Feed packaging material through
the feed clamp from back to front. Tear material at
the perforation or run a knife through the cutting
surface channel to cut material to size. (See Figure 4)
π
1-800-295-5510
uline.com
I-Bolt
Cutting Surface Channel
Figure 4
0624 IH-1034