INSTALLATION

1

REQUIRED TOOLS

Set of screwdrivers
Fixed wrenches (13 mm and 17 mm)
Allen key (5mm)
Marker pencil
Spirit level
2

REQUIRED MATERIALS

Screws for attachment to the base plate and the wall
angle
3

INITIAL CONDITIONS AND CHECKS

Initial conditions of the door
Check that the size of the door is within the
admissible range of the operator (see the
technical characteristics of the operator).
If the door to be automated has a pedestrian
door, use a safety device to prevent the
operator from operating with the pedestrian
door open.
The door must have a closing stopper.
Environmental conditions
This device is not suitable for installation in
inflammable or explosive environments.
Electrical power supply installation
The electrical connections shall be made in line
with the instructions in the control board
manual.
48
Installation Manual
Tape measure
Electrical drill and broaches
Use the electrical drill in line with the user
instructions.
Lubrication grease (graphite or lithium grease).
The door must be easy to handle manually, namely:
• It must be balanced, in order to ensure the effort
made by the motor is minimum.
• There should be no stiffness throughout its open/
close.
Do not install the operator in a door which
does not work correctly in manual operation,
as this may lead to accidents. Repair the door
before installing.
Check that the admissible environmental
temperature range for the operator is suitable
for the location.
The electrical wire section is indicated in: "Fig. 1
Elements of the complete installation" on page 43.