5.4.4
Commissioning with vapor
①
Pressure transmitter
②
Stabilizing valve
③
④
,
Differential pressure valves
⑤
Differential pressure lines
⑥
Shut-off valves
Figure 5-2
Measuring steam
Condition
All valves are closed.
Procedure
NOTICE
The measuring result is error-free only if the differential pressure lines
same temperature. The zero calibration must be repeated if required if these conditions are fulfilled. If the shut-off valves
⑥
and the differential pressure valves
possibility of the transmitter
To commission the transmitter for vapor, proceed as follows:
1. Open both the shut-off valves
2. Open the stabilizing valve
3. Wait until the steam in the differential pressure lines
4. Open the differential pressure valve
condensate escapes without bubbles.
5. Close the vent valve.
6. Open the vent valve on the negative side of the transmitter
7. Close the differential pressure valve
8. Open the differential pressure valve
30
③
are open at the same time and the stabilizing valve
①
being damaged due to the streaming vapor.
⑥
at the pressure tapping point.
②
.
③
and the vent valve on the positive side of the transmitter
③
.
④
slightly, until condensate escapes without bubbles, then close it.
⑦
Drain valves
⑧
Condensate pots
⑨
Differential pressure transducer/Orifice plate
⑩
Insulation
⑤
have equally high condensate columns with the
⑤
and in the equalizing vessels
①
slightly, until condensate escapes without bubbles.
SITRANS P, DS III series (7MF4.33.. 7MF4.34.. 7MF4.35..)
②
is opened, there is a
⑧
has condensed.
①
slightly, until
A5E03434626-02, 12/2012