6. Include an air switch with suitable capacity, according to the following table. An
air switch should include a magnetic buckle and heating buckle function to avoid
short-circuiting and overload.
Note: Never rely on a simple fuse to protect the electrical circuit; a grounded breaker
outlet should be installed.
AIR CONDITIONER POWER AIR SWITCH CAPACITY
9K, 12K: 10 amps
18K:
20 amps
24K:
25 amps
INSTALLATION INSTRUCTIONS
STEP 1: IDENTIFY INSTALLATION LOCATION
1. Following the steps in the pre-installation section, identify a proper installation
location and verify the location with the client.
STEP 2: INSTALL THE WALL-MOUNTING FRAME
1. Place the wall-mounting frame against the wall; ensure the frame is straight using
a level and mark the mounting hole locations on the wall.
2. Pose the frame on the ground.
3. Drill the mounting holes using an impact drill (the drill head size should be the
same as the expanding wall anchor.
4. Insert the wall anchors into the holes.
5. Mount the frame against the wall using self-tapping screws (ST4.2X25TA) and ver-
ify the frame is securely anchored by firmly pulling against it. If the frame is loose,
drill new mounting holes a few inches to the left or right of the original location.
IMPORTANT: Mounting hardware (screws and wall anchors) are not included.
–12–