Mechanical Installation; Attach The Instrument To A Wall - HACH LANGE PAT700 DS Manual Básico Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 75
To prevent measurement error, make sure that the instrument is attached in an upright, level position.
For environmental and sample requirements, refer to
• Put the instrument in a location that has access for operation, service and calibration.
• Install the instrument near the water system sample point.
• Make sure that there is a minimum of 30.48 cm (12 in.) of clearance for the enclosure doors to
open. Refer to
Figure 2
• Make sure that there is sufficient clearance to access the power switch, plumbing and electrical
connections on the end panels. Refer to

Mechanical installation

Attach the instrument to a wall

Personal injury hazard. Make sure that the wall mounting is able to hold 4 times the weight of the
equipment.
Install the instrument on a wall or other stable, flat surface. Refer to
Figure 3
for installation.
• Use user-supplied 8-mm (5/16-in.) diameter screws or bolts and nuts to attach the instrument to a
wall or other flat, rigid surface. Use hardware that is approved for a process environment.
• Do not attach bolts to separate girders, beams or wall studs that can move independently.
• Do not attach the instrument to a surface that has vibration.
8 English
N O T I C E
on page 9.
Figure 2
W A R N I N G
Specifications
on page 3.
on page 9.
Figure 2
for dimensions. Refer to

Publicidad

Tabla de contenido
loading

Tabla de contenido