Installation And Connection; Installing The Bip - Balluff BIP LD2-T -03-S75 Serie Manual De Instrucciones

Ocultar thumbs Ver también para BIP LD2-T -03-S75 Serie:
Tabla de contenido

Publicidad

BIP LD2-T_ _ _-03-S75
Inductive Positioning System
4

Installation and connection

4.1

Installing the BIP

NOTICE
Improper installation
Improper installation can compromise the function of the
BIP and result in damage.
► For this reason, ensure that no strong electrical or
magnetic fields are present in the immediate vicinity
of the BIP.
Notes on installation:
Any orientation is permitted.
Observe tightening torques, see Fig. 3-1.
In order to prevent effects on the measurement signal
by the installation material, a metal-free area around
the active surface of the BIP of approximately 20 mm
must be maintained (see Fig. 4-3). If the BIP detects
not only the magnet, but also another metal piece,
invalid measurement signals will result.
To obtain a measurement signal with high resolution,
suitable cable routing in the machine and filter
measures for system power supply must be ensured.
Fastenings (mounting clamps, brackets,
clamping frames, mounting brackets) are
available as accessories at www.balluff.com.
For mounting clamps see Accessories on page 19.
Recommended distribution of the mounting clamps as a
function of the respective BIP length L:
16
Fig. 4-1:
Recommended fastener spacing
Type
BIP LD2-T048-03-S75
BIP LD2-T070-03-S75
BIP LD2-T103-03-S75
BIP LD2-T133-03-S75
Tab. 4-1:
Fastener distances
www.balluff.com
L
A
L
A
64.0
28
92.5
60
121.0
89
149.5
118
Cut-outs must be provided to ensure visibility of the LED
display and access to the connectors (see Fig. 4-2).
Fig. 4-2:
Cut-outs
Maintain the following distances:
Installation material
1
≥ 20 (circumferential)
Fig. 4-3:
Installation dimensions
english
7

Publicidad

Tabla de contenido
loading

Tabla de contenido