Notes To The User; Symbols And Conventions; Scope Of Delivery; Approvals And Markings - Balluff BIP LD2-T -03-S75 Serie Manual De Instrucciones

Ocultar thumbs Ver también para BIP LD2-T -03-S75 Serie:
Tabla de contenido

Publicidad

BIP LD2-T_ _ _-03-S75
Inductive Positioning System
1

Notes to the user

1.1
Validity
This guide describes the construction, function, and setup
options for the inductive positioning system
BIP LD2-T_ _ _-03-S75 with IO-Link interface.
The guide is intended for qualified technical personnel.
Read this guide before installing and operating the position
measuring system.
1.2

Symbols and conventions

Individual instructions are indicated by a preceding
triangle.
► Instruction 1
Action sequences are numbered consecutively:
1. Instruction 1
2. Instruction  2
Note, tip
This symbol indicates general notes.
1.3

Scope of delivery

BIP
Fixing material
Condensed guide
4
english
1.4

Approvals and markings

UL approval
File no.
E227256
The CE Mark verifies that our products
meet the requirements of the current EU
Directive (EMC Directive).
The BIP meets the requirements of the following product
standard:
EN 61326-2-3 (noise immunity and emission)
Emission tests:
– RF emission EN 55011
Noise immunity tests:
– Static electricity (ESD)
EN 61000-4-2
– Electromagnetic fields (RFI)
EN 61000-4-3
– Electrical fast transients (burst)
EN 61000-4-4
– Conducted interference induced by
high-frequency fields
EN 61000-4-6
More detailed information on the guidelines,
approvals, and standards is included in the
declaration of conformity.
Severity level 3
Severity level 3
Severity level 3
Severity level 3

Publicidad

Tabla de contenido
loading

Tabla de contenido