ASSEMBLY STEP 2
HARDWARE FOR STEP 2:
FLAT
SPRING
WASHER (B)
WASHER (C)
8 mm
8 mm
Qty: 8
Qty: 8
CONSOLE MAST
MAIN FRAME
FLAT WASHERS (B)
SPRING WASHERS (C)
BOLTS (D)
A
Open HARDWARE FOR STEP 2.
Attach LEFT CONSOLE MAST so that BOLT (A)
B
BOLT (D)
70 mm
sits on the NOTCHED HOLE in the bottom of the
Qty: 8
CONSOLE MAST.
C
Attach LEFT CONSOLE MAST to MAIN FRAME
BRACKET using 4 FLAT WASHERS (B), 4
SPRING WASHERS (C) and 4 BOLTS (D).
11