Prepare Installation; Measure Installation - Best ICB3I SERIE Manual De Usario

Ocultar thumbs Ver también para ICB3I SERIE:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

2. PREPARE INSTALLATION

When performing installation, servicing or cleaning the unit, it is recommended to wear safety glasses and gloves.
NOTE: Before proceeding to the installation, check the contents of the box. If items are missing or damaged, contact the manufacturer.
Make sure that the following items are included:
Hood
Accessories
Decorative flue assembly (lower and upper flues)
2 Hybrid filters
1 Ceiling mounting bracket (screwed on top of the hood)
8 Angle brackets
8" Round adapter/damper (in a separate box)
Bag of parts (taped on the blower box) including: 2 wire connectors, 1 wire clamp, 8 no. 10 x 1½" wood screws,
8 steel washers, 10 no. 8 x 3/8" quadrex screws, 17 no. 10-32 flanged locknuts, 50 x 10-32 x 1/2" quadrex hex head screws,
2 no. 8 x 1/2" low profile Phillips screws, 2 no. 8 x 1/2" quadrex black screws.
Parts sold separately:
Ducts, elbows, wall and roof caps.
Optional flue extension for 10-ft. ceilings model no. AEICB3SB (stainless steel) or no. AEICB3BLS (black stainless steel).
Optional remote control (model no. ACR3).
Glass panels for ICB3I36SBN model (see replacement parts list).
NOTE: During installation, protect countertop and/or cooktop.

3. MEASURE INSTALLATION

Determine the required distance between the ceiling and the top of the blower
box (C) based upon ceiling height (B) and desired height of hood above cooktop (A).
NOTE: C = B - A - 12 3/16"
WARNING
!
B
BOX TOP
BOTTOM
4
LOWER
12
3
"
16
R
ANGE
HOOD
12
3
"
C = B - A -
16
A
HH0157A
C
EILING
C
B
C
OOKTOP

Publicidad

Tabla de contenido
loading

Tabla de contenido