Installation Requirements - Quick ARIES Serie Manual Del Usuario

Ocultar thumbs Ver también para ARIES Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

BEFORE USING THE WINDLASS READ THESE INSTRUCTIONS CAREFULLY.
IF IN DOUBT, CONTACT YOUR NEAREST "QUICK
WARNING: the Quick
Quick
®
shall not be held responsible for damage to equipment and/or personal injury, caused by a faulty use
of the equipment.
Always deactivate the windlass when not in use.
The splice between the rope and the chain must be tightly woven for the rope to slide easily into the gypsy shape. For
any problem or request, feel free to contact Quick
least two anchor windlass controls in case one is accidentally damaged.
magnetic switch as the motor safety switch.
The contactor unit or reversing contactor unit must be installed in a point protected from accidental water contact.
After completing the anchorage, secure the chain or rope to fi xed points such as chain stopper or bollard.
To prevent accidental releases, the anchor must be secured. The windlass shall not be used as the only securing device.
Isolate the windlass from the power system during navigation (switch the circuit breaker off) and lock the chain securing it to
a fi xed point of the boat.
THE PACKAGE CONTAINS: windlass (on deck unit + motorgearbox) - contactor unit - base gasket - drill template - handle - bolts and
screws (for assembly) - user's manual - conditions of warranty.
TOOLS REQUIRED FOR INSTALLATION: drill and drill bits: Aries/Flair/Rider Ø 9 mm (23/64") and Ø 11 mm (7/16");
hollow mill: Aries/Flair Ø 53 mm (2"1/16) and Ø 70 mm (2"3/4), Rider Ø 60 mm (2" 23/64) ; hexagonal wrenche: 13 mm.
®
"QUICK
"ACCESSORIES RECOMMENDED: anchoring RL control board (mod. 800) - Waterproof hand helds R/C (mod. HRC1002)
- Foot switch (mod. 900) - Hydraulic-magnetic circuit breaker - Anchor chain counter (mod. CHC1102M and CHC1202M) - Radio control
RRC (mod. R02, PO2, H02).

INSTALLATION REQUIREMENTS:

per and lower surfaces of the deck are as parallel as possible. If this is not the case, compensate the difference appropriately (a lack of
parallelism could result in a loss of motor power). The deck thickness must be included among the fi gures listed in the table. In cases of
other thicknesses it is necessary to consult a Quick
chain; lack of depth of the peak could cause jamming.
FITTING PROCEDURE:
excess material from the chain passage, refi ne and fl atten with a specialized product (marine paint, gel coat or two pack epoxy) to
assure free passage for both rope and chain. Position the upper section, inserting the gasket between the deck and the base and
connect the lower section to the assembly, inserting the shaft into the reduction unit. Fix the windlass by screwing the nuts onto the
fi xing studs. Connect the supply cables from the windlass to the contactor unit.
WARNING: before wiring up, be sure the electrical cables are not live.
AFR 700/1000/1400W - REV012A
®
windlasses are designed to weigh the anchor.
The windlass is not designed for the loads that might occur in extreme weather conditions (storms).
the windlass must be positioned with the gypsy aligned with the bow roller. Ensure that the up-
®
retailer. There must be no obstacles under deck to the passage of cables, rope and
max
5 mm
(3/16")
when the ideal position has been established, drill four holes using the drilling template provided.Remove
®
" DEALER.
Do not use the equipment for other purposes.
Check that there are no swimmers nearby before dropping anchor.
®
Technical Service.
Secure the chain with a further device before starting the navigation.
INSTALLATION
For improved safety we recommend installing at
We recommend the use of the Quick
40 cm
(16")
45°
90°
90°
90°
GB
®
hydraulic-
13

Publicidad

Tabla de contenido
loading

Tabla de contenido