Calibration - SFS isoweld 3000 Instrucciones De Operación

Ocultar thumbs Ver también para isoweld 3000:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Calibration

When should the tool be calibrated?
every morning before starting work
when moving to another building site
when working with a different material (PVC instead of TPO or vice-versa,
thinner or thicker waterproof membrane)
change from 110V to 230V or vice-versa
change of generator (USA, CAN) or transformer (UK)
Ensure that the project parameters are set correctly (waterproof
membrane material and thickness).
Only use material for calibration which has been defined for the current
project.
Calibration process
1.
Use the calibration template and place an isoweld
provided for it (A).
2.
Push the calibration template on to the corner of the waterproof membrane
(B).
3.
Place the inductor into the calibration device and ensure that it is positioned
correctly (C): the arm (D) to the inductor must be resting in the recess (E)
provided.
A
4.
Press the
L
5.
Press the
OK
6.
You are now in the calibration program.
7 .
Press the start button (2).
8.
The automatic calibration is completed when there is a beeping sound
for 1 second and the display returns to standard view.
The tool is now calibrated.
B
or
button to move to CALIBRATION.
M
button to open the calibration program.
E
C
isoweld
®
®
plate into the recess
C
3000
isoweld
D
®
Backpack
21

Publicidad

Capítulos

Tabla de contenido
loading

Productos relacionados para SFS isoweld 3000

Este manual también es adecuado para:

Isoweld backpack

Tabla de contenido