GARANT GridLine cabinets
ü Floor has sufficient load-bearing capacity.
1. Screw attachment brackets to the top of the cabinet using two nuts and bolts.
2. Mark a hole for each attachment bracket and move the cabinet out of the way.
3. Drill holes in the wall, insert wall plugs and screw the attachment bracket to the wall.
5.3. ANCHORING TO THE FLOOR
5.3.1. Roller shutter cabinet
D
ü Wall plugs and screws chosen to match the nature of the floor.
en
ü Floor has sufficient load-bearing capacity.
ü Adjusted levelling base. [} Page 37]
1. Take lower storage shelf out of cabinet by lifting it at the holes on the sides.
CAUTION! Risk of cuts. Wear safety gloves.
2. Mark drilling spots through the holes in the cabinet floor and move the cabinet out of the way.
3. Drill the holes in the floor. Insert the plugs and bolt the cabinet to the floor.
6. Assembly
CAUTION
Assembly work
Risk of crushing feet or hands when assembling and when closing drawers.
» Wear safety shoes and safety gloves.
» Ensure safe footing on clean, level surface.
» Do not assemble by yourself.
6.1. ALL CABINETS
6.1.1. Cabinet to cabinet
E
ü Cabinets are of identical height and depth. Otherwise drill through cabinet wall.
1. Insert four M6×12 bolts through both side walls at top and bottom.
2. Screw on four M6 nuts from the other side.
6.1.2. Inserting/moving storage shelf
CAUTION
Toppling shelves
Crush hazard and impact hazard for individual limbs.
» Make sure the shelf is in the correct position.
» The shelf must abut the rear of the cabinet, leaving no gap.
» The front edge of the shelf must not project beyond the shelf carrier.
F
1. Insert four shelf carriers per shelf at identical height in socket strip.
» Shelf carrier's hooks face downwards.
2. Set the shelf down on shelf carriers.
» The shelf must abut the rear of the cabinet leaving no gap, it must sit firmly on the shelf car-
rier. The front edge of the shelf must not project beyond the shelf carrier.
38
Instruction manual