pre-operation cHecKlist:
Before starting the unit, answer the questions in this checklist:
codes:
. Does the electrical supply meet respected codes?
2. Does all gas supply piping meet respected codes?
location:
. Is the unit on a level surface in a dry area protected from
excessive wind, rain and moisture?
2. Is the unit located away from flammable and combustible
material?
3. Is the unit located in a large enough area for adequate air flow?
electrical:
. Is the unit properly grounded?
2. Do all electrical components used meet requirements shown on
the unit I.D. Plate and is the voltage correct?
Gas supply:
. Is the proper fuel type (L.P.-Gas) being used for your
pressure washer?
2. Does the gas supply meet the demand of the BTU rating of the
burner?
3. Is all piping the right size and have all gas connections been
checked for leaks?
4. Is the gas valve completely open?
5. Are the propane tanks (if applicable) employed large enough to
avoid freezing according to the unit's rating (30lb. L.P.-Gas Cylinder
or larger)?
General:
. Have all operators using this unit read the Installation and Operator's
Manual and understood all safety warnings?
2. If installed, has the unit been installed by qualified service people
who followed the Installation and Operator's Manual instructions?
3. Is there ample water supply?
if no Was marKed for any of tHese Questions, correct tHe situation before
6
installation instructions
Questions
operatinG tHis Gas-fired unit.
YES
HLP-SERIES Hot Water Pressure Washer Operator's Manual
NO