12
I-17 / I-40 Manual and Spark Ignition
Gas Train Assembly
Your heater is supplied with one of the following gas
train assemblies. Refer to the appropriate illustrations.
FIG. 3
BUSHING
TO GAS
SUPPLY
VALVE, SHUT-OFF
FIG. 4
A
NUT
- ASSEMBLE FITTING
FIG. 5
A
VALVE
SHUT-OFF
BUSHING
NIPPLE
DUST CAP
- ASSEMBLE COUPLING KIT, PART #21335,
& TIGHTEN COMPONENTS SECURELY.
- CONNECT TO GAS SUPPLY.
Owner's Manual • I-17 / I-40
STANDARD HOSE
RIGID END
OF HOSE
1/8 NPT FITTING KIT, PART #23406
STEM
FITTING ASSEMBLY
CONTROL VALVE
INLET
HOSE & QUICK COUPLING KIT
B
COLLAR
COUPLING
- PULL BACK COUPLING COLLAR.
- FIRMLY PUSH MALE HOSE END
INTO COUPLING
- RELEASE COLLAR. ENSURE
MALE HOSE END IS SECURELY
LOCKED INTO COUPLING.
CONNECT HOSE TO GAS
INLET, TIGHTEN SECURELY
- ATTACH FITTING TO GAS INLET
& TIGHTEN SECURELY.
- CONNECT APPROVED GAS HOSE ASSEMBLY
WITH APPROPRIATE CONNECTIONS TO 1/8 NPT
FITTING.
MALE END
CONNECT HOSE TO GAS INLET
& TIGHTEN SECURELY
B
C