Proper Use; Mains Connection; Technical Data - EINHELL GC-DW 900 N Manual De Instrucciones

Bomba sumergible a presión
Ocultar thumbs Ver también para GC-DW 900 N:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 28
Anleitung_GC_DW_900_N_SPK7__ 25.06.13 10:26 Seite 9
Submersible pressure pump
Original operating instructions

3. Proper use

The equipment you have purchased is designed to
pump water with a maximum temperature of 35 °C.
This equipment must never be used for other liquids,
especially engine fuels, cleaning agents and other
chemically-based products!
The equipment is to be used only for its prescribed
purpose. Any other use is deemed to be a case of
misuse. The user / operator and not the
manufacturer will be liable for any damage or injuries
of any kind caused as a result of this.
Please note that our equipment has not been
designed for use in commercial, trade or industrial
applications. Our warranty will be voided if the
machine is used in commercial, trade or industrial
businesses or for equivalent purposes.

4. Technical data

Power supply
Power rating
Delivery rate max..
Delivery height max
Immersion depth max.
Water temperature max.
Hose connection
Max. particle size
Power cable
5. Before putting the equipment into
operation
5.1 Installation
The equipment can be installed either:
Stationary with rigid tubing
or
Stationary with a flexible hose line
Connect the pressure hose or pipe to the
pressure
connector (1) using a suitable connector.
The appliance must be fastened to the hanging
loops with a rope (Fig. 1/Item 2).
Note:
The pump shaft should measure at least
40 x 40 x 50 cm so that the floating switch can move
freely.

5.2 Mains connection

The equipment you have purchased comes with an
earthing-pin plug. The equipment is designed for
connection to a socket outlet with earthing contact for
230 V ~ 50 Hz. Make sure that the socket-outlet is
sufficiently fused (at least 6 A) and in good working
order. Insert the power plug in the socket-outlet and
the equipment is ready for operation.
Important!
To rule out danger, this work must be left strictly to a
specialist electrician or Customer Service.
6. Operation
You can put the equipment into operation after you
have thoroughly read the installation and operating
instructions. Pay attention to the following points:
Please note
1. Lower the pump into the well or shaft using the
securing cable.
230 V ~ 50 Hz
2. Please make sure that the pumps are at least
900 Watt
20cm under the surface of the water and about 30
cm above the ground.
6.000 l/h
3. Connect the plug to the mains power.
32 m
8 m
Setting the ON/OFF switching point:
The ON/OFF switching point of the floating switch can
35°C
be adjusted by shifting the floating switch in the
ca. 33,3 mm (G1) IG
floating switch notched holder (Fig. 1/Item 3).
Check the following points before putting the
2,5 mm
equipment into operation:
11 m
The floating switch must be fitted so that the
switching point height: ON and the switch point
height: OFF can be reached easily and with little
force. Check this by placing the equipment in a
container filled with water and carefully raising
and lowering the floating switch with your hand.
You can then see whether the equipment
switches on and off.
Make sure that the distance between the floating
switch head and the cable holder is not too small.
If the distance is too small, there is no guarantee
that the equipment will work correctly.
When adjusting the floating switch, make sure
that the floating switch does not touch the bottom
before the equipment is switched off. Important!
Risk of dry running.
GB
9

Publicidad

Tabla de contenido
loading

Tabla de contenido