15
Preliminary operations
7.1 Checking for room suitability
The lift has been designed to be used in covered and sheltered places.
The place of installation must not be next to washing areas, painting work stations, solvent or
paint deposits. The installation near rooms where a dangerous situation of explosion can occur
is strictly forbidden. It is necessary to check compliance with the provisions of regulations on
health and safety at work with respect to minimum distance from walls, work or safety areas of
other machines or equipment, escape paths, etc.
7.2 Lighting
Lighting must be compliant with the regulations in force in the place of installation. All areas
of the lift must be illuminated in an even and sufficient way to ensure the adjustment and
maintenance operations provided by this manual, avoiding dark areas, reflections and glare.
7.3 Installation surface or installation pit
The lift must be placed on a sufficiently resistant horizontal surface. The surface and
foundations must be suitable for bearing maximum stress values, also in the worst working
conditions. In case of in-ground/recessed installation, the finished size of the pit must be
verified (as per drawing sent at the time of order). For installation on raised surface,
compliance with the maximum load bearing capacity of the surface is recommended.
102