Mechanical Checks; Set Up And Adjustments - Corghi ERCO Serie Manual De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Lubricate with grease the sliding block housings positioned under the platforms
and on the base frames;
Lift fixing points to the ground with 8 anchor bolts (min. recommended size ø
= 16 mm);
Clean all parts of the machine;
Proper oil level in the tank;
No leakage and blow-by;
Cylinder operation.
Carry out two or three complete cycles of lowering and lifting and check:
the lift for reaching its maximum height;
the up limit switch for proper operation;
the down limit switch for proper operation;
levelling limit switch for proper operation (both platforms should lower
simultaneously);
the buzzer/signalling light for proper operation during the final travel
WARNING: please carefully follow the instructions in the
next paragraph in order to avoid lift damage.
7.9 Testing and inspections

7.9.1 Mechanical checks

7.9.2
Hydraulic system check

7.10 Set up and adjustments

7.10.1 Check without load
115

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Erco 630Erco 635Erco 640

Tabla de contenido