Abbreviations And Terminology; Important Notes; Technical Specifications - Franke AQRE431 Instrucciones De Montaje Y Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 17
2.

Abbreviations and terminology

TWW
TW
SW
DN
FAR-Best.-Nr.
EA-Nr.
Conversion
All length specifications in the graphics are in mm.
3.

Important notes

• Installation, commissioning and maintenance are to be performed only by a qualified
technician according to the instructions provided.
• Legal requirements and the technical connection regulations of the local water supply
companies must be complied with.
• Before assembling and installing the equipment, flush the supply pipes in accordance
with DIN 1988.
• Use suitable cleaning agents that are not harmful to the fittings in a proper manner
and rinse with water after use. High-pressure cleaners must not be used for cleaning.
• Only use a 6V lithium battery for the power supply.
• Forced flushing after 24 hours of non-use ensures the exchange of water in tap lines
and prevents the odour seal in the urinal drying out. This function can be switched off
with the optional remote activation unit. This function is switched on at the factory.
• All rights reserved to make technical alterations.
4.

Technical specifications

Flow pressure:
Calculation flow rate:
Flush water volume:
Flush water volume:
Voltage supply:
Type of protection:
4
Warm drinking-water
Cold drinking-water
Hook spanner
Nominal diameter in mm
Franke-Aquarotter order number
European article number
1 mm = 0.03937 inches
1 inch = 25.4 mm
1.0 – 4.0 bar
0.30 l/s
0.3 – 0.7 l /s
2 – 4 l adjustable
6 V lithium battery (CR-P2)
IP 65

Publicidad

Tabla de contenido
loading

Tabla de contenido