KIT TO TRANSFORM THE STOVE POLIS
FROM POLIS TO DUCTED
(optional code 758510)
In order to distribute hot air in other rooms of the house
in addition to the installation room, the following components
are required.
- No. 1 centrifugal fan (A)
- No. 1 ductwork pipe with fl ange connection (B)- No. 1 10x2
adhesive gasket L=450 (C)
- No. 2 fl at washer D.6x12 (D)
- No. 2 hex-head screws 6x16 (E)
KIT 11 (code 645700)
TO CHANNEL HOT AIR INTO AN ADJACENT ROOM
IN ADDITION TO THAT OF INSTALLATION
Includes:
a
Box
b
Ø 10 pipe
c
Smoke outlet end-piece
d
Wall medallion
e
Flue cover
f
Flue cover fastening screws
g
Pipe blocking clamp
NOTE:
THE FIRST PART OF THE FLEXIBLE PIPE MUST BE
COMPLETELY "RELAXED" IN SUCH AWAY TO ELI-
MINATE CORRUGATION. IN THIS WAY, THE INTER-
NAL DIAMETER WILL BE SLIGHTLY ENLARGED TO
FAVOUR ENTRANCE.
Procedure:
- Defi ne the position of the stove with respect to the walling
(fi g. a).
- Cut the fl ue cover to size (e) on the wall side (fi g. b)
- Place the stove in its defi nite position.
- Extend the aluminium pipe (b) for hot air channelling, wi-
thout connecting the stove outlet.
- Fit the medallion (d) on the aluminium pipe and the pipe
cover (e) without locking it in (fi g. b).
- Fit the aluminium pipe to the hot air outlet on the back of the
stove (g) (fi g. c).
- Place the pipe cover (e) in the defi nite position and fasten it to
the back of the stove with the supplied screws (f) (fi g. c).
- Install the terminal outlet (c) and its aluminium pipe (b) (fi g.
c).
- Fasten the wall medallion (d) with silicone (fi g c).
HOT-AIR DUCTWORK
n° 1
n° 1
n° 1
n° 1
n° 1
n° 4
n° 2
- 37
-
C
D
A
E
1
4
3
8
g. a
3
5
g. b
6a
4 8
5
3
6a
B
D
E
5
7
6a
8
5
g. c
4
8
7
6a