Bosch BPT-C 200 Instrucciones De Servicio página 152

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

60 | Installation
BPT-C 200, 300, 350 | Operating manual
(4)
(5)
(1)
5.5:
Wiring diagram: Plug (left) and receptacle (right)
[1]
Not assigned
[2]
Not assigned
[3]
CAN GND
[4]
CAN H
[5]
CAN L
2. Connecting the CAN cable
(4)
5.6:
Underside of the control cabinet
(1)
Internal cabling
[2]
CAN display (assigned)
[3]
CAN In (connection from upstream inverter in a photovoltaic system,
monitoring unit or manufacturer's GridControl.)
[4]
CAN Out (connection from downstream inverter in a photovoltaic system or
terminating resistor. Each CAN bus must be terminated with a terminating
resistor (R = 120 Ω.)
3. Route the CAN cable in a loop to the front, right-hand cabinet support
and secure in place
Please note the following here:
It must be possible to fold out the control cabinet with the CAN cables
connected.
4. Route the cable below the cabinet support and secure in place
Please note the following here:
(3)
(3)
(5)
(2)
(2)
(3)
(2
(1)
English
(4)
(1)
(1)
Bosch Power Tec GmbH

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Bpt-c 300Bpt-c 350

Tabla de contenido