Broan ERV70S Guia De Instalacion página 8

Ocultar thumbs Ver también para ERV70S:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4. I
(
'
NSTALLATION
CONT
4.4 I
D
NSTALLING THE
UCTWORK AND
4.4.3 S
I
IMPLIFIED
NSTALLATION
When performing duct connections, always use approved tools and materials. Respect all corresponding
laws and safety regulations. Please refer to your local building code.
When performing duct connections to the furnace supply duct (Method 1), this duct must be sized to
support the additional airflow produced by the unit. Also, the use of metal duct is highly recommended.
For a Return-Return installation, the furnace blower must be in operation when the unit is in operation.
There are 2 methods for connecting the unit to the furnace/air handler:
Method 1: Supply-Return Connection
M
ETAL DUCT
VJ0077
Stale air intake
Cut an opening into the furnace return duct not less than 10 feet from the furnace/air handler (A+B).
Connect this opening to the Exhaust air from building port of the unit.
Fresh air distribution
Same instructions as for Method 1 or Method 2, Section 4.4.2.
For Method 2 (Return-Return), make sure there is a distance of at least 3 feet between the 2 connections to the furnace/air
handler.
If using Method 2, make sure the furnace/air handler blower operation is synchronized with the unit
operation! See Section 6 Electrical Connection to the Furnace.
NOTE: For Method 1, it is not essential to synchronize the furnace blower operation with the unit operation, but we recommend it.
)
D
R
(
EGISTERS
CONT
(
AS ILLUSTRATED IN
M
INIMUM
A
A+B =
NOT LESS
10'
THAN
'
)
D
S
3.3)
ECTION
!
WARNING
CAUTION
18"
B
CAUTION
8
Method 2: Return-Return Connection
M
INIMUM
VJ0078
A
B
3'
A+B =
NOT LESS
10'
THAN

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Erv70tHrv80sHrv90sHrv80tHrv90t

Tabla de contenido