6. Installation
6.14
EN
Inside view
Inserting the roof cover:
Now insert the roof cover carefully(!) (paying particular attention to the sharp edges of the aluminium profile) from the side. When doing so,
ensure that the water drainage holes on the top face and the roof gutter underneath the roof cover are in alignment with each other.
General instruction: The image may differ at detail level.
6.15
Inside view
Fastening the tensioning system to the side panels:
To do so, mount the connector to the central hole in the front roof profile and install both expanded cords as shown in the figure. Illustration
without the roof cover.
General instruction: The image may differ at detail level.
16
10
This installation manual must be given to the customer and kept safely during the entire period of use!
5
10
11
10