2. meChanICal InStallatIOn

The Current/Voltage Measurement Unit (UMCT) can be installed in
any position.
The UMCT´s 1, 2, 3 and 4 can be mounted directly on a 35 mm
(1.38 in) DIN rail or fixed by means of M4 screws, using the screw fixing
adapter (PLMP).
The UMCT´s 5 and 6 present only the M4 screw mounting possibility.

3. eleCtRICal InStallatIOn

The Current/Voltage Measurement Unit (UMCT) is connected to the
Control Unit (UC) through a ribbon cable.
The ribbon cable for the connection of the UMCT to the relay can be
acquired in the following models:
120 mm (4.72 in) UMCT connection cable
500 mm (19.68 in) UMCT connection cable
1000 mm (39.37 in) UMCT connection cable
2000 mm (78.74 in) UMCT connection cable
attentIOn!
The Current/Voltage Measurement Unit (UMCT) can be
installed up to 2 m distant from the Control Unit (UC).
6
Table 1: UMCT connection cables
UMCT Connection Cables
Description
- English -
Model
SRW01-CB1
SRW01-CB2
SRW01-CB4
SRW01-CB3