EN
Finally, we will connect the mouth of the tank with the hopper.
Leave a side separation (2-3 cm) between the tank and the boiler.
Introduce the endless pipe inside the pellet-feeding placed in the hopper of the boiler.
Then, fix the endless screw (auger) to the tank by screwing it to the rear holes.
INSTALLATION, OPERATING AND SERVICING INSTRUCTIONS
SHW
AMBIENT
THERMOSTAT
PROBE
3 WAY
VALVE
CONNECTION
ANNEXED TANK
The electrical connection of the tank must be made by technical personnel.
On the back of the boiler the installer will find the connection where to connect the
two cables of the pellet loading motor.
Once the electrical connection is made in the technical menu. For the HydroBoreal-A
model, the following parameters must be modified:
P48 = 2 (default settings)
T23 = 600 (time)
T24 = 3600 (time)
On the other hand, in the HydroBoreal model , you will have to modify the following
parameters.
P36 = 2 (modifications)
T23= 600 (time)
T24 = 3600 (time)
38
HYDROBOREAL