56
53
52
51
50
49
55
45
46
43
44
48
31
47
19
17 18
16
15
14
11
26
18
11
21
12
11
23
20
22
47
24
2
54
3
24
4
5
6
41
47
7
42
8
9
10
28
27
40
33
32
29
11
1
4
25
5
6
10
37
38
39
40
36
36
35
34
Before the installation starts, we suggest to carry out following inspections and
31
operations:
1_The gate framework must be strong and suitable.
2_The gate must not show too many sideways slide skids during the running.
3_The system of wheels/lower rail and roller/upper runner must work without too
many frictions.
4_To avoid the gate derailment you must install the stop beats of the sliding,
whether at the opening or closing, and a second upper roller/runner in full
observance of the current law.
5_Remove any manual lock in the beforehand gates.
6_Take on the gate bottom the feed raceway of the feeding cables (Ø25-50mm)
30
and of external connection (photocell, flash-light, key selector, etc...).
SET PANEL
5
8
7
1
PREVIOUS INSPECTIONS
6 4
1
Gear-motor
2
Flash-light
GB
3
Antenna.
4
Key selector
5
Photocell
6
Small columm
7
Rack
8
Limit switch
9
Warning sign
10
Stop locks
9
2
3
5
8
5
6
6
10
10