LIST OF MATERIALS
Removing the packaging.
I CAUTION
Remove carton carefully, Wear gloves to protect against sharp
edges.
I WARNING
Remove the protective film covering the product before put-
ting into operation.
Supplied Part
Hood assembly with blower and
LED lamps already installed
5x45 mm
4x8 mm
Tools/Materials required
• Level
• Drill
• 1¼" (3 cm) drill bit
• ⅛" (3 mm) drill bit
• Pencil
• Wire stripper or knife
• Tape measure or ruler
• Pliers
Ducting Options
Closely follow the instructions set out in this manual. All res-
ponsability, for any eventual inconveniences, damages or fires
caused by not complying with the instructions in this manual,
is declined.
Preparation
Do not cut a joist or stud unless absolutely necessary. If a joist
or stud must be cut, then a supporting frame must be
constructed.
Fittings material is provided to secure the hood to most types
of walls/ceilings.
However, a qualified technician must verify suitability of the
materials in accordance with the type of wall/ceiling.
Before making cutouts, make sure there is proper clearance
within the ceiling or wall for exhaust vent.
Pieces
1
4
10" round air transition
10
Parts no supplied
• Caulking gun and weatherproof caulking compound
• Vent clamps
• Jigsaw or keyhole saw
• Flat-blade screwdriver
• Metal snips
• Phillips screwdriver
The hood is equipped with an 10" (25.4 cm) round transition
for discharge of fumes to the outside.
Roof Venting
A
G.
10" (25.4 cm) round vent
H.
Wall cap
Supplied Part
Side spacers
Wall Venting
B
C
B
A.
Wall cap
B.
10" (25.4 cm) round vent
C.
90º elbow
Pieces
2
1
A
5