Unpacking; Cylinder With 100-Litre Capacity; Checking The Scope Of Delivery; Cylinder With 200-Litre Capacity - Vaillant VPS R 200/1 B Instrucciones De Instalación Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 51
4.1

Unpacking

1.
Remove the product from the packaging.
2.
Remove the protective film from all of the product's
components.
4.2

Checking the scope of delivery

Check the contents of the package.
Applicability: VPS R 100/1 M
Quantity
Description
1
Buffer cylinder
1
Bag with three feet, three washers and six
nuts
2
Wall-fixing strip
4
Pin for securing the wall-fixing strip to the
cylinder
1
Lower cover, which must be attached when
securing the cylinder to the wall
3
Pin for securing the cover, washer and cover
for the pin
1
Cylinder dry pocket
1
Stuffing box
6
G1"1/2 plug + seal
1
Documentation records
Applicability: VPS R 200/1 B
Number
Description
1
Buffer cylinder
1
Bag with three feet, three washers and six
nuts
2
Cylinder dry pocket
2
Stuffing box
6
G1"1/2 plug + seal
1
G3/4 plug for draining the cylinder
1
Enclosed documentation
0020244064_00 Installation and maintenance instructions
4.3
Dimensions of the product and the
connections
4.3.1

Cylinder with 100-litre capacity

Ø563
256
4.3.2

Cylinder with 200-litre capacity

Ø600
Installation 4
65

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Vps r 100/1 m00100214560010021457

Tabla de contenido