Wiring; Start-Up; Purging The Product - Vaillant VPS R 200/1 B Instrucciones De Instalación Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 51
5.1.2.4 Case no. 4
2
2
4
1
1
1
Heat pump
2
Boiler
3
Heating circuit
4
Plug
5.2

Wiring

Note
If the temperature sensor is not enclosed, this
must be ordered separately.
1.
Screw the sensor pocket (1) into the cylinder.
2.
Screw the stuffing box (2) into the sensor pocket (1).
3.
Use a thermal conductivity lubricant to insert the tem-
perature sensor (3) into the sensor pocket (1).
Applicability: VPS R 200/1 B
To guarantee the leak-tightness of the cylinder, always
install the two sensor pockets, even if only one tem-
perature sensor is used.
0020244064_00 Installation and maintenance instructions
3
4
4
4
3
1
2
3
6

Start-up

1.
When filling the product, observe the installation instruc-
tions for the heating generators.
2.
Check that the hydraulic and electric connections are
correctly designed.
3.
Check whether the connections are leak-tight.
4.
Purge your heating installation.
6.1

Purging the product

Applicability: VPS R 100/1 M
B
C
Open the purging valve (1) when filling the heating
circuit with water.
Applicability: VPS R 200/1 B
1
Open the purging valve (1) when filling the heating
circuit with water.
1.
Close the purging valve as soon as water flows out (re-
peat this measure several times, if required).
2.
Check whether the air separator connection is leak-
tight.
Start-up 6
1
A
B
C
69

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Vps r 100/1 m00100214560010021457

Tabla de contenido