Vaillant VPS R 200/1 B Instrucciones De Instalación Y Mantenimiento página 70

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 51
5 Installation
Caution.
Risk of damage caused by corrosion.
If non-diffusion-tight plastic pipes are used in
the heating installation, this may cause air to
enter the heating water and corrosion of the
heat generation circuit and the boiler.
If using non-diffusion-tight plastic pipes
in the heating installation, separate the
system by installing an external heat ex-
changer between the boiler and the heat-
ing installation.
1.
Attach a drain cock at the lowest point in the system.
2.
Depending on your system, connect the circuits in ac-
cordance with the basic drawing shown below.
Applicability: VPS R 200/1 B
Connect a drain cock to the drain connection on the
cylinder.
If you do not connect a drain cock, attach the drain
plug (1) in order to guarantee the leak-tightness of the
cylinder.
5.1.2
Basic hydraulic connection diagram
5.1.2.1 Case no. 1
2
2
1
1
1
Heat pump
2
Boiler
3
Heating circuit
4
Plug
68
5.1.2.2 Case no. 2
1
Heat pump
2
Heating circuit
1
3
Plug
5.1.2.3 Case no. 3
1
3
4
1
Heat pump
4
2
Heating circuit
3
3
Plug
1
3
3
1
3
3
3
1
Installation and maintenance instructions 0020244064_00
2
3
3
2
2
2
3
3
3

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Vps r 100/1 m00100214560010021457

Tabla de contenido