Setting The Date And Time; List Of Alarms - SFA SANIFOS 110 Manual De Instalación

Ocultar thumbs Ver también para SANIFOS 110:
Tabla de contenido

Publicidad

1. Choice of languages
Press to select
language
Return
2. Setting parameters
AC
10:48:20
REGLAGES

2.1 Setting the date and time

Parameter required for alarm management, history and maintenance
periods. The date and time will be saved as soon as they are validated
with OK.
2.2 Setting the time delay
Allows optimised pumping times as a function of the total dynamic head
AC
10:48:42
PUMP DELAY:
4s
Delay to activate P2
30s
2.3 Indication of the next maintenance procedure
AC
10:48:50
Maintenance :
Next: FEVRIER 2017
Industriel:
Petit collectif:
Domestique:
3. Consulting the log

3.1 List of alarms

Alarm indicator in real time, with identification of the problem detected for
quick maintenance. Option to view alarm history.
Indication of the
type of alarm
Date and time
of last alarm
AC
10:46:52
››
LANGUE
P1
P2
Allows certain parameters to modified to optimise the operation of the pumping station.
In order to empty the tank as much as possible and optimise the pumping of the materials on the surface,
we can increase the engine shut-down time. Pre-set to 4 seconds after float OFF. The higher the pump,
the longer the time delay will be.
The motor activation time is pre-set to 30 seconds. After thirty seconds of continuous operation, the
second motor is activated to reinforce the first one. If this parameter is too long (for the client), it is possible
to decrease the delay.
OK
Gives the date of the next maintenance procedure, a reminder on the screen will be displayed on
the scheduled date. Maintenance frequencies are different depending on the area of use of the station
(according to EN12056-4).
For:
• Industrial use: 3 months • Small collective use: 6 months
• Domestic use: 12 months
OK
Press OK to confirm the type of use.
AC
10:47:18
ALARM 16
ALM:Pas de AC
Le 29 DECEMBRE 2016
a 10:52:32
ALM15
ALM17
Switch to next menu,
language selection
LANGUE
FRANCAIS
››
ENGLISH
ESPAGNOL
DEUTSCH
Date
:29
DECEMBRE 2016
Il est : 10:48 et 30s
OK
Enter the
history
History check
AC
10:45:53
Up and down arrow to
AC
10:48:30
increase or decrease
Left and right arrow
to change from day to
month, to year, to hour,
to minute ... until OK
which will validate the
P1
entry.
P2
JOURNAL
Liste Alarme
Temps pompes
››
Graph U
Graph I1
Graph I2
UK
AC
10:47:10
P1
P2
133

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sanifos 250Sanifos 500

Tabla de contenido