Preparing VCIBxxJP Housing Framework
The unit must be mounted to the surrounding housing. See "Installation Preparation" on page 6 for suggestions for
determining hood height.
When calculating the load for the housing support system, be sure to include the weight of the ventilation unit. See Table 3
on page 6 for unit weight by model.
Build housing in accordance with the dimensions noted in Figure 28 thru Figure 32.
Model
VCIB36JP
3
14
" (360 mm)
/
16
VCIB48JP
13
19
" (503 mm)
/
16
VCIB54JP
13
22
" (579 mm)
/
16
Back of Liner
Back of Hood
A
"
3/ 16
3
23"
(81mm)
(584mm)
1/ 8
"
1
(29mm)
A
"
3/ 16
3
(81mm)
Figure 28: Transition and Conduit Cutout Dimensions
(86mm)
"
7/ 8
7
(200mm)
10¼"
Diameter
(260mm)
clearance
holes for 1"
(25.4mm)
conduit to
junction box
"
3/ 8
2
7/ 8
1
"
(48mm)
English 23