Astralpool 66175 Manual De Instalación página 14

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 57
2B2 period two
2-----------------Calibration----------------------
2B21 First Point
2B22 Second Points
2B23 Active
3.3.4
TEMPERATURE PROBE CALIBRATION
Connect the probe to the instrument as indicated in the electrical connections.
Select the TEMP. probe from the Calibration menu.
TEMP
CAL.
25.0°C
CL
CAL.
28.0°C
CL
CAL.
28.0°C
Wait
10"
0000137242
Type: MAN
Type: MAN
Type: MAN
Rev. 6.0
It makes chlorine reading through a
reference device.
Choose "Period one" option and change
until the value shown on the screen brings
up the value read by the reference device
and press Enter.
Wait for 10 seconds until the calibration is
completed.
Close the water input to the chlorine probe
holder and wait for about 100 seconds
Choose "Period one" option and change until
the value shown on the screen (lower then
the period one) brings up the value read by
the reference device and press Enter.
Wait for 10 seconds until the calibration is
finished.
Press the button ''Active'' on the menu to
finish the calibration.
In Manual (MAN) mode:
Use a reference instrument to read the
temperature value.
Adjust the value shown on the display to
match the value read by the reference
instrument. Press Enter to confirm.
Wait 10 seconds for the calibration to
complete.
Once the operation has concluded, a
message will appear indicating that the
calibration has been carried out successfully.
12

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

661766617766178

Tabla de contenido