PREPARING FOR INSTALLATION
PREPARING FOR INSTALLATION
The well should be developed (cleaned) and disinfected
before the pump is installed.
Write the pump model number, pump serial number and
motor serial number in the space provided in this Installation
and Operation Manual (IOM). Leave the completed IOM
attached to the tank or control box in a dry area or give it to
the owner. Attach your business card.
Verify that motor voltage, control voltage, coil voltage
(3 phase starters) and power supply voltage match. Electrical
installation must be performed by qualified personnel.
Inspect all components for shipping damage and insure that
you have all the components that are required: Pump Water
End, Motor, 1Ø Motor Control Box or 3Ø Starter with
Overloads, Pressure Tank, Pressure Switch, Copper Wire,
Pressure Relief Valve (if required), Torque Arrestor (if
required), Pipe and Fittings.
2.0
MECHANICAL ASSEMBLY –
2.0
MECHANICAL ASSEMBLY –
2.1 Typical Systems
4
Pump and Piping
Pump and Piping
Figure 1
Figure 2
Pump in "Can"
Figure 3
Pump with Flow Sleeve in Tank
Figure 4
Pump with Flow Sleeve in Large Diameter Well
Figure 5
Horizontal Pump in "Can"
Figure 6