Operations For Putting The Machine Into Service; When The Machine Is New; Preparing For Seeding; Attachment The Tractor - GASPARDO SP Serie Empleo Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

ENGLISH
5.0 OPERATIONS FOR PUTTING THE
MACHINE INTO SERVICE

4.1 WHEN THE MACHINE IS NEW

5 . 2 C H E C K S A N D P R E V E N TAT I V E
MAINTENANCE

5.3 ATTACHMENT THE TRACTOR

safety devices.
A
USE AND MAINTENANCE

5.4 PREPARING FOR SEEDING

ries use, whose selection is entirely at the user's discretion,
must be suitable for the type of seed to be distributed and
to the type of seed bed.
5.5 DISTRIBUTION OF CHEMICAL PRODUCTS
B
-
cod. G19501383

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sp 2Sp 6Sp 4Sp 5Sp 8Sp 12

Tabla de contenido