ELICA Ecolution Platinum-Ola-Wave Guía De Instalación, Uso Y Mantenimiento página 9

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

installation is unique. Consult template and Figs.above.
c. Install drywall; then refinish ceiling.
Determine the required position for the conduit and cut a
1-1/4" (3.2 cm) hole at this location.
Run wires through hole according the National Electrical
Code or CSA Standards and local codes and
ordinances.
d. Tape Template in place and mount the support bracket
with wood screws (Supplied in mounting hardware kit)
on locations marked on template, then remove template.
3. Prepare the support bracket, suitably adjusting the
length of the cables according to the following formula:
L = X-Y-H+1" 3/16
L = truss extension
X = distance between the ceiling and the bottom edge of
the hood
After finding the right length, secure the cables,
tightening the lock nuts with a spanner.
4. Apply the support bracket on the ceiling, passing the
cables for the electrical connection through the middle
hole.
Fix with 3 wood screws.
IMPORTANT! The support bracket is equipped with a
wire (yellow/green) which must be connected to the
earth of the household electrical system.
5. Apply the aesthetic cap to cover the hood, passing the
interconnection electrical cable inside.
Important: Make sure the interconnection cable does
not touch the lamps and arrange the excess part using
the cable clamps located at the top of the hood.
6. Fix the hood to the hooking brackets and secure with 1
screw for each bracket (COMPULSORY FIXING).
9

Publicidad

Tabla de contenido
loading

Tabla de contenido