Installation Instruction - Rotary AR14 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4'-6" Min. To
Nearest
Obstruction
Fig. 1
REAR
Read and understand these instructions
completely before proceeding with lift installation.
1.
Lift Location: Use architects plan when available to locate
lift. Fig. 1 shows dimensions of a typical bay layout. For
power unit at right front, rotate lift 180°, leaving ramp/chocks
and wheel stops in original position. Lift floor area should be
level.
WARNING
DO NOT install on asphalt or other similar
unstable surface. Columns are supported only by anchors in floor.
Ceiling or overhead clearance must be 92" plus height of tall-
2.
est vehicle.
transit
COLUMN SHIM ESTIMATES
Fig. 2

INSTALLATION INSTRUCTION

Left Runway
Right Runway
LIFT CLEARANCE
target
L
C
3.
Estimating Column Shim requirements:
In the following section, the terms "highest" and "lowest"
refer to elevation of floor.
A. Mark locations where lift columns will be positioned in bay.
B. Place target on floor at column positions (NOT on column
base plates) and record readings, Fig. 2.
C. Find the highest of the four locations. Find the difference
between the reading at each of the remaining three columns
and the highest reading.
D. The difference is the estimated amount of shim thickness
needed at each column.
Note: Maximum shim thickness is 1/2" per column using shims
and anchors provided with lift. Shim thickness of 2" is possible by
using optional shim kit #FC5393. Contact your authorized Rotary
Parts Distributor for ordering information.
Note:
Target is positioned on floor at planned column
positions (NOT on column base plates).
Dimension at highest position minus other position
2
2'–0" Min. To
Nearest
Obstruction
6'-6" Min.
Nearest Obstruction
6'-6" Min.
Nearest Obstruction
FRONT
= shim thickness required
To
To