TOOL INSTALLATION
Your Duo-Fast tool comes ready for immediate
®
use and can be installed by following these steps:
1. SAFETY - All tool operators and their immediate
supervisors must become familiar with the operator
safety instructions before operating the tool. The
instructions are on page 4 of this manual.
2. Included with each tool is a copy of the operation
manual and schematic. Keep this publication for
future reference. An ownership registration card is
also included. This card must be completed and
returned to Duo-Fast immediately to register your
®
ownership.
3. The plastic cap in the air inlet of the tool must be
removed before the male fitting is installed. The fit-
ting must be a male pneumatic type that discharges
the air from the tool when the air line is discon-
nected.
4. Install a filter/regulator/lubricator unit, with a
gauge as close as practical to the tool, preferably
within ten feet. Refer to the Air Systems section of
this manual for air hose requirements and lengths.
In general, no other special installation is required.
5. If the operator is working at a bench or table,
it is usually best to run the air line underneath the
bench. A small tray under the benchtop can hold
the fastener supply and the tool when not in use.
6. If this tool does not work when it is first connect-
ed, do not try to make repairs. Call your Duo-Fast
representative immediately.
TOOL OPERATION
Loading of Nails
Step No. 1-
one hand and with the other hand depress the door
latch. Swing the magazine and door open.
Step No. 2-
nail coil and place the nail coil in the magazine with
the tips of the nails against the loading tray and about
4 inches of coil unwound.
Step No. 3-
top of the feeder body assembly and feed the nails
over the feed pawls until the first nail is in the nose
raceway.
®
Step No. 4-
the gate making sure the gate is latched securely.
5
Grasp the nailer handle firmly with
Remove the retaining tape from the
Slide the free strip of nails along the
Close the magazine cover and then