Installation Preparation - GE Appliances GFDS175 Manual De Instrucciones

Ocultar thumbs Ver también para Appliances GFDS175:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

STACKING THE WASHER AND
DRYER (if desired) (cont.)
STACKING KIT GEFLSTACK CONTENTS
(OPTIONAL ACCESSORY)
Left hand bracket
Right hand bracket
4 rubber pads
TOOLS YOU WILL NEED
Phillips screwdriver
Open-ended wrench
Pliers

INSTALLATION PREPARATION

Remove the packaging.
Flatten the product carton to use as a pad to lay the
dryer down on its side. Continue using the carton to
protect the finished floor in front of
the installation location.
Installation Instructions
4 #12 x 1" screws
4 #8 x 1/2" screws
Gloves
Level
INSTALLING THE STACK BRACKET
KIT
REMOVE THE DRYER LEVELING LEGS
1
A. Carefully lay the dryer on its side. Use the
packing material so you don't scratch the finish
on the dryer.
B. Use an open-end wrench or pliers to remove the
dryer leveling legs.
INSTALL RUBBER PADS TO DRYER
2
BASE
Locate the 4 rubber pads in the parts package.
Remove the adhesive backing and firmly place
over each bracket where you removed the
leveling legs.
15
Back out and remove
all 4 leveling legs
Place pads over
all four leveling
leg brackets

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Appliances gfds170Appliances gfdn160

Tabla de contenido