Maintenance Schedule En - Abicor Binzel iROB Cool Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

iROB Cool
13.3 Maintenance schedule
No.
Maintenance
Maintenance work to be
interval
carried out
1
Weekly
Check coolant level.
2
Monthly
Clean the finned radiator from dust
using compressed air.
3
Monthly
Check the coolant supply and return
hoses for impurities, replace if
necessary.
4
Every six
Change the coolant.
months
5
Every six
Flush the finned radiator against the
months
direction of supply/return flow.
6
Every six
Flush the tank.
months
7
Every six
Check the connections for tightness; if
months
necessary, tighten hose clamps using
pliers.
8
Yearly
Inspection and checking during
operation.
Tab. 15
Maintenance schedule
BAL.0332.0 • 2017-08-31
Maintenance schedule
Carried out
on
13 Appendix
Signature/remark
Next
maintenance
EN - 25

Publicidad

Tabla de contenido
loading

Tabla de contenido