RIB DUKE Serie Manual Del Usuario página 21

Operador irreversible para cancelas de batiente
Ocultar thumbs Ver también para DUKE Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

E
MErGENCY rELEAsE
To be carried out after having disconnected the power supply to
the motor.
in order to carry out the manual operation of the gate leaf the followings
must be checked:
- That the gate is endowed with appropriate handles;
- That these appropriate handles are placed so to avoid safety risks for
the operator;
- That the physical effort necessary to move the gate leaf should not be
higher than 225 N, for doors/gates for private dwellings, and, 390N for
doors/gates for commercial and industrial sites ( values indicated in
5.3.5 of the EN 12453 norm) .
in the case of a power cut, the gate can be opened manually by
releasing the lock on the operating lever to allow the gate to move
freely (Fig. 8).
IMPOrTANT: Please make sure that the leaves stop
against the mechanical stoppers inside
the operator before they reached the
ground mechanical stopper. In not
adjusted, unblocking will be impossible.
s
AfETY CLUTCH ADJUsTMENT
There is no mechanical safety clutch with the DUKE.
Therefore it is necessary to operate this operator with an electronic
control panel fitted with an electronic force regulator.
Use the T2 (for one or two single-phase motors) electronic control
unit.
ACCEssOrIEs -
T
2
Automatic travel and timing code learning system
Pedestrian opening command
Pedestrian and total automatic closure
Pre-blinking
Adjustable slow speed in approaching
Electronic adjustment of the force
radio command - step by step or automatic total opening
radio command - step by step or automatic pedestrian opening
Single command - step by step or automatic
Electric lock release operation
built-in radio receiver 433MHz
Management of the photocells
Automatic closing after the transit through the photocell
Management of the blinker
Management of the strips
Safety strip autotest as required by EN12453
Key selector
buzzer
Electric lock
code AbT2000 => CrX 230/50-60HZ
code AbT2001 => 230/50-60HZ
code AbT2002 => CrX 120/60HZ
code AbT2003 => 120/60HZ
for the connections and the technical data of the optional equipments follow the relevant
handbooks.
E
LECTrICAL sAfETY DEVICEs
The installation must be installed according to the current regulations
and laws. Use the T2 (for one or two single-phase motors) electronic
control unit. For connections and technical data of accessories refer to
the appropriate booklets.
M
AINTENANCE
To be undertaken by specialized staff after disconnecting power
supply.
Make certain that moving parts located inside the box are greased once
a year, and check the force transmitted through the drive to the gate.
in the event that the need for servicing or repairs should arise, the
speed reducer can be removed from the box without taking down the
gate.
- lift the cover from the box, isolate the motor from the power supply by
disconnecting the cable, then remove the curved lever: the gate can
now swing freely.
- Then unscrew the for nuts that fix the motor.
1
1
G
B

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Duke 110Duke 180Aa10975Aa10985

Tabla de contenido