Zodiac Jandy EE-Ti Manual De Instalación Y Operación página 4

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Page 2
ENGLISH
Anchor Clamp Positions .............................9
Anchor Clamp Installation ..........................9
Standard Plumbing Layout ....................... 11
Combinations ........................................... 11
Wiring Diagram ........................................13
Diagram ...................................................14
the Time Clock .........................................15
Figure 12a. Remote Pool-Off-Spa Connection
(3-Wire Connection) .................................16
Figure 12b. AquaLink RS or Remote TSTAT
Connection (2-Wire Connection) ..............16
Center ......................................................18
Figure 15. Main Control Panel ..................................20
View (EE2000 Shown) .............................29
Zodiac
®
Jandy
®
Heat Pumps Model EE-Ti
Figures and tables
Table 1.
Table 2.
Table 3.
Table 4.
Table 5.
|
Installation and Operation Manual
EE-Ti Heat Pump Technical
Specifications .............................................6
Heat Pump Clearances ..............................7
Optimal Water Chemistry Ranges ............23
Heat Pump Troubleshouting Guide ..........26
Heat Pump Diagnostics ...........................27

Publicidad

Tabla de contenido
loading

Tabla de contenido